EFFECT OF GAS-OIL-RATIO ON OIL PRODUCTION

For more Petroleum Engineering projects click here


ABSTRACT


Maximum production from an oil well can be achieved through proper selection of tubing size. The selection of optimum tubing size must be evaluated when completing a well in any type of reservoir especially solution gas drive reservoir since there is likelihood of producing more gas as the reservoir pressure declines. The most widely used methods such as Tarner, Muskat and Tracy methods for predicting the performance of a solution gas drive reservoir were discussed and used to estimate the behaviour of producing GOR. A comparison was made between the results from each method. System analysis approach was adopted for this study. The future IPR curves were determined by a combination of Vogel and Fetkovich correlation. Beggs and Brill multiphase spreadsheet was used to produce the TPR curves by estimating flowing bottomhole pressure for several tubing size using the predicted GOR produced and a range of flowrates. The effect of water production was also considered in this study. The results showed that for IPR5 as GOR increased from 1052 to 1453 scf/stb, oil production rate for 2 7/8-in increased by 17.6% and 3.3% for a further increase in GOR at 2610 scf/stb. At a GOR of 2610 scf/stb oil production decreased by 3.17% at water-cut of 5% and 9.5% at water-cut of 25%. All things being equal, the percentage reduction in production reduces as GOR increases from 2610 to 5635 scf/stb for all the tubing sizes used.


CHAPTER 1

INTRODUCTION



Production optimization identifies the opportunities to increase production and reduce operating costs. The overall goal is to achieve the optimum profitability from the well. To achieve and maintain this, it is essential to evaluate and monitor different sections of the production system including, the wellbore sandface, reservoir, produced fluids, production equipment on surface and downhole. Several methods are being used for production optimization. The most common and widely used method is the system analysis approach commonly known as nodal analysis.

Optimization of the wellbore is considered mainly during well completion stages. Tubing joints vary in length from 18 to 35 feet although the average tubing joint is approximately 30 feet. Tubing is available in a range of outer diameter sizes. The most common sizes are 2 3/8-in, 2 7/8-in, 3 1/2-in and 4 1/2-in. The API defines tubing as pipe from 1-in to 4 1/2-in OD. Larger diameter tubulars (4 1/2-in to 20-in) are being termed casing. (Schlumberger, 2001)


The flow rate per well is the key parameter. It governs the number of wells that need to be drilled to achieve the optimum economic output of the field. The first parameter that needs to be considered in the tubing string selection is the nominal tubing diameter. The grades of steel and nominal weight are chosen based on the stress the tubing will have to withstand during production. Thirdly, depending on the how corrosive the existing and future effluents, the type of connection and the metallurgy are selected. In fact the different stages mentioned above overlap and sometimes make the choice of tubing a difficult job. In the determination of the nominal pipe diameter, the nominal diameter through the weight governs the inside through diameter of the pipe. The flows that can pass through it depend on the acceptable pressure losses but are also limited by two parameters: the maximum flow rate corresponding to the erosion velocity and the minimum flow rate necessary to achieve lifting of water or condensate. Tubings with diameter less than 2 7/8-in are mostly reserved for operations on well using concentric pipe and are termed macronic string. Note also that the space required by couplings of the tubing limits the nominal tubing diameter that can be run into the production casing. (Perrin, et al., 1999).

1.1 Vertical Lift Problems relating to tubing


In lieu of the usefulness of tubing strings in oil and gas production, it can have some limitations. Tubing wear occurs most often in pumping wells. It depends little upon whether the hole is vertical or slanting, but it is much worse in dog-legged holes regardless of the deviation. It may either be external or internal. If external, it is usually the couplings which are affected and the cause is the rubbing against the inside of the casing in phase with the reversing strokes of the sucker rods. If the wear is internal, it is caused by the sucker rods. There can be leakage from the inside to the outside or vice versa. This can be attributed to the API thread shape used (the V-shaped or round thread shape.) The tubing string can be flattened from wall to wall by either having a higher hydrostatic pressure or as a result of diastrophic shifting of formation caused by an earthquake. Since some 90 percent of all oil-well tubing is upset design, practically all failures are in the body of the pipe. However, any tension failures are rare because tubing is almost always run inside of casing and except for occasional trouble of unseating packers; it seldom becomes stuck and therefore needs not be pulled on. As with upset casing, upset tubing will stretch before failing. The tubing will burst when the pressure inside the tubing string is higher than the pressure in that annulus. This tubing trouble is commonly seen in high pressure wells and can be exceeding serious. (Hexter, 1955).....


For more Petroleum Engineering projects click here
___________________________________________________________________________
This is a Postgraduate Thesis and the complete research material plus questionnaire and references can be obtained at an affordable price of N3,000 within Nigeria or its equivalent in other currencies.


INSTRUCTION ON HOW TO GET THE COMPLETE PROJECT MATERIAL

Kindly pay/transfer a total sum of N3,000 into any of our Bank Accounts listed below:
·         Diamond Bank Account:
A/C Name:      Haastrup Francis
A/C No.:         0096144450

·         GTBank Account:
A/C Name:      Haastrup Francis
A/C No.:         0029938679

After payment, send your desired Project Topic, Depositor’s Name, and your Active E-Mail Address to which the material would be sent for downloading (you can request for a downloading link if you don’t have an active email address) to +2348074521866 or +2348066484965. You can as well give us a direct phone call if you wish to. Projects materials are sent in Microsoft format to your mail within 30 Minutes once payment is confirmed. 

--------------------------------------------------------
N/B:    By ordering for our material means you have read and accepted our Terms and Conditions


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as guide in developing your original research work.

Delivery Assurance
We are trustworthy and can never SCAM you. Our success story is based on the love and fear for God plus constant referrals from our clients who have benefited from our site. We deliver project materials to your Email address within 15-30 Minutes depending on how fast your payment is acknowledged by us.

Quality Assurance
All research projects, Research Term Papers and Essays on this site are well researched, supervised and approved by lecturers who are intellectuals in their various fields of study.
Share:

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.

Search for your topic here

To view a full list of Project Topics under your Department

Featured Post

Article: How to Write a Research Proposal

Most students and beginning researchers do not fully understand what a research proposal means, nor do they understand ...

Popular Posts