TABLE OF CONTENTS

Title page
Abstract
Table of contents

CHAPTER ONE: INTRODUCTION
1.1       Preamble
1.2       Statement of the problem
1.3       Aim and Objectives
1.4       The study area
1.5       Justification of the study
1.6       Limitations

CHAPTER TWO: LITERATURE REVIEW
2.1       Water distribution system
2.2       Storage and distribution reservoirs
2.3       Systems of water supply
2.4       Pumping schedule
2.5       Condition assessment

CHAPTER THREE: MATERIALS AND METHODS
3.1       The study area
3.2       Description of the distribution system
3.2.1Pump stations
3.2.2 Pipe lines
3.2.3 Storage facilities/booster pump station
3.2.4 Booster pump station
3.3       Methods
3.3.1 Condition assessment
3.4       Performance indicators
3.4.1 Development of evaluation approach
3.4.2 Operational capacity utilizations
3.4.3 Sustainable and effectiveness ranking approach (SERA)
3.4.4 Swot analysis
3.5       Operation and maintenance
3.6       Pumping schedule

CHAPTER FOUR: RESULTS AND DISCUSSION
4.1       Condition of the Distribution System
4.1.1Pipes Properties
4.1.2    Valves
4.1.3 Pumps
4.1.4 Service Reservoirs
4.1.5    Hydrants
4.2       Performance Evaluation Analysis
4.2.1 Discussion of results of Performance Evaluation Analysis
4.3       Swot Analysis
4.4       Operation and Maintenance
4.4.1  Pumps and Pumping Station
4.4.2 Maintenance of Pumping Machines
4.5Staffing
4.6       Pumping Schedule
4.6.1 Water Demand
4.6.2 Existing Pumping Schedule
4.6.3 Physically Feasible Operating Pumps Combination
4.6.4 Time Required to Fill Each Service Reservoir
4.6.5 Total water consumption per day
4.6.6 Required Storage Capacity
4.6.7 Pumping Schedule Analysis
4.7       Operation and maintenance plan
4.7.1   Transmission mains
4.7.2 Maintenance Schedules
4.7.3 Service Reservoirs
4.7.4 Distribution System
4.7.5 Pumps
4.8       Bill of Engineering Measurement and Evaluation

CHAPTER FIVE: CONCLUSION AND RECOMMENDATIONS
5.1       Conclusion
5.2       Recommendations
References
Appendices



ABSTRACT


In this thesis, a diagnostic assessment of the entire water supply distribution network was carried out in order to evaluate problems associated with water supply in Minna. This assessment was carried out by conducting inventory of all the facilities in the entire water supply distribution network by onsite, physical and visual inspection of all the elements in the distribution system during operation. Qualitative assessment of equipment/facilities physical conditions and functionality was conducted using numeric rating of 0-4. The situational analysis of the system was also carried out using performance indicators such as SPEM, SERA and SWOT analyses. Detailed evaluation of overall operation and maintenance and pumping schedule plan was looked into. The results clearly shows that the transmission pipes, service reservoirs, pumping stations and valves in the distribution system are in good physical condition and are functioning properly. However, most of leakages and burst occur in asbestos pipe in the distribution system and valves in the transmission system. The system has 56% operation and 70% human resources capacity with the total evaluation capacity using SPEM as 60%. While the performance evaluation using SERAwas 39%. The type of maintenance carried out is simple reactive rehabilitation approach any time there is failure. A suggestion of proactive rehabilitation was made which is better than reactive rehabilitation approach. Thus, it will be appropriate to pump water from 0000 to 0600 hours and 1200 to 1800 hours to meet the water demand and minimised cost of operation. The sum of Nineteen Million Two Hundred and Nineteen Thousand naira (N19,219,000:00) would be required to repair the pumps and replaced the valves that are in bad condition.




CHAPTER ONE

INTRODUCTION

1.1 PREAMBLE

Water is a primary life-giving resource. Its availability is an essential component in socio-economic development and poverty reduction. Water is fundamental to our way of life at whatever point in the socio-economic spectrum a community may be situated.

The essential paradox of water supply in developing countries is that, in one sense, everyone has a water supply, in another sense, most people have not. Water is essential for life and all human communities must have some kind of water source. It may be dirty, it may be in adequate in volume and it may be several hours walk away but, nevertheless some water must be available. However, if reasonable criterion of adequacy- in term of the quantity, quality and availability of water- then most people in developing countries do not have an adequate supply (Cairncrossand Feachem, 1988)

More so, delivery of safe reliable supply of drinking water to consumers tap depends on the integrity of the distribution system. The pipe networks, extending over large areasencompasses multiple connections and points of access typically constituting the bulk of water utility assets. Propermanagement of water system is crucial for ensuring sustainability of a given water resource, maintaining high quality water resources, and maximizing the utility’s ability to respond to profound operating conditions.

1.2 STATEMENT OF THE PROBLEM

Minna water distribution network consists of the pumping station, distribution piping which comprises of transmission mains and distribution mains, valves, hydrants and service reservoirs. Mays (2004) opined that a water distribution system operates as a system of........


For more Water Resources & Environmental Engineering project click here


___________________________________________________________________________
This is a General Thesis for both Undergraduate & Postgraduate Studies. The complete research material plus questionnaire and references can be obtained at an affordable price of N3,000 within Nigerian or its equivalent in other currencies.


INSTRUCTION ON HOW TO GET THE COMPLETE PROJECT MATERIAL

PAYMENT  OPTION 1:
Kindly pay a total sum of N3,000 into any of our Bank Accounts listed below:
·         Skye Bank Account:
A/C Name:      Haastrup Damilola
A/C No.:         1013708342

·         GTBank Account:
A/C Name:      Haastrup Francis
A/C No.:         0029938679
After payment, send your desired Project Topic, Depositor’s Name, Teller No., and your Active E-Mail Address to which the material would be sent for downloading (you can request for a downloading link if you don’t have an active email address) to +2348074521866 or +2348066484965. You can as well give us a direct phone call if you wish to. Projects materials are sent in Microsoft format to your mail within 30 Minutes once payment is confirmed.


PAYMENT  OPTION 2:
You can make an online payment here for this material:


After a successful Online Web Payment, kindly Click Here to fill the “Payment Details Form”


--------------------------------------------------------
N/B:    By ordering for our material means you have read and accepted our Terms and Conditions


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as guide in developing your original research work.

Delivery Assurance
We are trustworthy and can never SCAM you. Our success story is based on the love and fear for God plus constant referrals from our clients who have benefited from our site. We deliver project materials to your Email address within 15-30 Minutes depending on how fast your payment is acknowledged by us.

Quality Assurance
All research projects, Research Term Papers and Essays on this site are well researched, supervised and approved by lecturers who are intellectuals in their various fields of study.