FRAMEWORK FOR DETERMINING PERFORMANCE OF CONSTRUCTION PROJECTS IN NORTHERN NIGERIA


For more Quantity Surveying Project click here



TABLE OF CONTENTS

Title page
Abstract
Table of contents

CHAPTER ONE
INTRODUCTION
1.1       Background to the Study
1.2       Statement of Research Problem
1.3       Justification for the Study
1.4       Aim and Objectives
1.4.1    Aim
1.4.2    Objectives
1.5       Scope and Limitation
1.5.1    Scope
1.5.2    Limitations

CHAPTER TWO
LITERATURE REVIEW
2.1       Performance
2.2       Performance Measurement
2.3       Performance Measures/Indicators
2.4       Importance of Performance Measurement
2.5       Benchmarking
2.6       Performance Measurement of Project in the Construction Industry
2.7       Traditional and Non Traditional Criteria Used In Measuring Construction Projects Performance
2.8       Frameworks for Measuring Performance
2.8.1    Characteristics of Performance Measurement Frameworks
2.8.2    Existing Performance Measurement Frameworks
2.9       Organisational Structure in Relation to Performance
2.9.1    Organisational System Design
2.9.2    Relationship between Organisational Structure and Performance Measurement Criteria

CHAPTER THREE
RESEARCH METHODS
3.0       Research Approach
3.1       The Quantitative Research Approach
3.2       Data Collection Method
3.3       Questionnaire Survey
3.4       Sampling Method
3.5       Data Analysis Techniques

CHAPTER FOUR
RESULT, ANALYSIS AND DISCUSSIONS
4.1       Data Presentation
4.2       Data Analysis
4.3       Interpretation of Results

CHAPTER FIVE
SUMMARY, CONCLUSION AND RECOMMENDATIONS
5.1       Summary of Findings
5.2       Conclusion
5.3       Contribution
5.4       Recommendations
References




ABSTRACT


Several researches have been carried out in order to develop frameworks for determining performance of construction projects which were mostly based on Traditional criteria (i.e. cost, time and quality) only. And researches have highly criticized the use of traditional criteria only while determining construction project performance due to its inadequacy. However, literature has never developed framework for determining performance of Construction Projects using the emerging/non-traditional criteria since they also influence performance. This study developed a framework using the emerging construction projects performance criteria in the Northern Nigeria which was achieved through the following objectives; the identification of emerging criteria for determining performance of construction projects, assessment of the level of importance of the emerging criteria and development of framework for determining performance of construction projects using the emerging criteria. A total of 285 questionnaires were distributed to some construction industry stakeholders (i.e. Consultants, Contractors, Clients and End-users) were asked to assess the level of importance of the emerging criteria. A total of 147 valid questionnaires were retrieved which represents 51.58% of valid response rate and subsequently analysed using descriptive analysis with the aid of Statistical Package for Social Sciences (SPSS) software. The most important criteria ranked by the respondents are; client satisfaction on outcome, effective risk management, client satisfaction on cost, client satisfaction on time etc. Most important criteria ranked by respondents are client oriented base. Using the emerging criteria for determining performance of construction projects as ranked by respondents in descending of priority will help the parties of the construction industry to understand how important those criteria are. Furthermore, it was also found that most important criteria as key areas of activity which favorable results are absolutely necessary for a goal to be achieved. Additionally, using the framework developed in this study for determining performance of construction projects will help in the monitoring of performance and redirect organisational action when necessary. Lastly, it can also help the contractors’ and other key stakeholders of the construction industry particularly the clients and consultants to monitor and evaluate projects more accurately towards achieving project objectives.




CHAPTER ONE


INTRODUCTION

1.1              Background to the study

The construction industry is dynamic in nature due to the increasing uncertainties in technology, budgets, and development processes (Chan, Scott and Ada, 2004). They further reported that, building projects are becoming much more complex and difficult, and facing unprecedented changes. Those uncertainties, along with many other documented problems, are the root causes of project delays and decline in construction projects performance (Ofori, 1991; Ogunlana, Promkuntong and Jearkirm, 1996).

The improvement of performance has become more critical to the success of construction projects which have been the subject of considerable amount of research and attention over the past two decades (Al-Otaibi, Omani and Price, 2013).

Studies have shown decline in construction projects performance both locally and internationally (Ogunlana, Li and Sukhera, 2003; Komolafe, Kingsley and Muhammad, 2014).

A number of authors have worked significantly on ways to improve performance from the view point of traditional criteria (i.e. cost, time and quality) (Neely et al., 1994; Idrus and Sodangi, 2010; Barkley and Saylor, 1994). Furthermore, in response to the decline of projects performance, several studies have developed and advocated the use of frameworks for assessing construction projects with a view to improve their performance (Cocca and Alberti, 2009; Kagioglou, Cooper and Ghassan, 2001; Belassi and Tukel, 2006). But the frameworks developed by several researches were mostly based on the traditional criteria that have been highly criticized (Paul, 2014). Additionally, some authors have argued that construction project......


For more Quantity Surveying Project click here


___________________________________________________________________________
This is a General Thesis for both Undergraduate & Postgraduate Studies. The complete research material plus questionnaire and references can be obtained at an affordable price of N3,000 within Nigerian or its equivalent in other currencies.


INSTRUCTION ON HOW TO GET THE COMPLETE PROJECT MATERIAL

Kindly pay/transfer a total sum of N3,000 into any of our Bank Accounts listed below:
·         Diamond Bank Account:
A/C Name:      Haastrup Francis
A/C No.:         0096144450

·         GTBank Account:
A/C Name:      Haastrup Francis
A/C No.:         0029938679
After payment, send your desired Project Topic, Depositor’s Name, and your Active E-Mail Address to which the material would be sent for downloading (you can request for a downloading link if you don’t have an active email address) to +2348074521866 or +2348066484965. You can as well give us a direct phone call if you wish to. Projects materials are sent in Microsoft format to your mail within 30 Minutes once payment is confirmed. 

--------------------------------------------------------
N/B:    By ordering for our material means you have read and accepted our Terms and Conditions


Terms of Use: This is an academic paper. Students should NOT copy our materials word to word, as we DO NOT encourage Plagiarism. Only use as guide in developing your original research work.

Delivery Assurance
We are trustworthy and can never SCAM you. Our success story is based on the love and fear for God plus constant referrals from our clients who have benefited from our site. We deliver project materials to your Email address within 15-30 Minutes depending on how fast your payment is acknowledged by us.

Quality Assurance
All research projects, Research Term Papers and Essays on this site are well researched, supervised and approved by lecturers who are intellectuals in their various fields of study.


Share:

Search for your topic here

To view a full list of Project Topics under your Department

Featured Post

Article: How to Write a Research Proposal

Most students and beginning researchers do not fully understand what a research proposal means, nor do they understand ...

Popular Posts